Captrain Solutions: Salzgitter
for Salzgitter Flachstahl GmbH

Requirements
- Transports of steel products from Salzgitter to 15 recipients in Germany, the Benelux countries and France
- customer supply with scrap and coke coal
- Flexibility in case of volume fluctuations
- Constant wagon availability without demurrage
- Short transport times
Services
- Tailor-made logistics train system (SLOT = Salzgitter Logistics Train) with 20 loading points and multiple daily departures
- 300 wagons optimally tailored to customer requirements
- Innovative load securing
- Efficient connection operation thanks to innovative hybrid locomotive technology
- Daily consultation for shipment prioritisation
- Continuous quality and utilization monitoring
Facts & Figures
Industry:
Metall industry and trade
Transport volume:
over 300,000 tons