Integrated Logistics
Requirements
- Pre-material transport from Duisburg to Zeithain
- Loop transport from the pipe mill in Zeithain
- Intermediate storage of loops up to their call-off by the recipient plants in Germany, France and the Netherlands
- Return transport of high-quality loading aids
Services
- Industrial railway operation in Zeithain, central shunting hub in Gütersloh, connection operation in the recipient plants
- Tailor-made and cross-border train system
- Development and provision of an innovative wagon optimally suited
- to hot primary material, loops and loading devices
Facts & Figures
Industry:
Steel
Transport volume:
220,000 tons of tube primary material and
160,000 tons of loops